He Dreiht Offshore Wind Farm Successfully Installed! 🎉
29 agosto, 2024Sin categorizar
A big congratulations to Heerema Marine Contractors and EnBW Energie Baden-Württemberg AG on the successful installation of the He Dreiht offshore wind farm! This project is a major step forward in sustainable energy.
Heerema Engineering Solutions is proud to have been part of the team, contributing the innovative Noise Mitigation System (NMS 10000). This advanced system is designed to install monopiles up to 10 meters in diameter, reduce driving noise by 15 decibels, and operate at water depths of up to 42 meters.