Congratulations to Eni for achieving first oil with MODEC, Inc.’s FPSO MIAMTE MV34 operating in the Offshore Area 1 block in the Bay of Campeche in the Gulf of Mexico.
Congratulations to Eni for achieving first oil with MODEC, Inc.’s FPSO MIAMTE MV34 operating in the Offshore Area 1 block in the Bay of Campeche in the Gulf of Mexico.
Moored in a water depth of approximately 32 meters, approx ten (10) kilometers off Mexico’s coast, the FPSO is capable of handling 90,000 barrels of oil per day, 75 million cubic feet of gas per day, and 120,000 barrels of water injection per day with a storage capacity of 700,000 barrels of oil.
The FPSO boasts a Disconnectable Tower Yoke Mooring System (“DTYMS”), a first-of-its-kind design developed by SOFEC, Inc. and fabricated in Altamira. The state-of-the-art DTYMS was developed to moor the FPSO in shallow water, allowing the unit to disconnect its mooring and depart the area to avoid winter storms and hurricanes prevalent in the Gulf of Mexico.
Read the full press release here: https://lnkd.in/g-2AuP8z
Don’t miss the 3rd Edition of Shallow and Deepwater Mexico October 11-13, 2022 in Ciudad del Carmen, Campeche. www.offshoremx.com
#offshore #oilandgas #energy #upstream #gulfofmexico #Subsea #sdmxnews #shallowanddeepwaterexpo